Brightline Debuts Fluorescent-to-LED Conversion Kit

Video lighting systems solutions provider Brightline recently announced the debut of a retrofit package that lets users upgrade Brightline S1.2 or S1.4 fluorescent studio fixtures to LED fixtures. The conversion kit allows users to make the switch for only a quarter of the full fixture cost, according to a news release, and can help educational institutions save money on electricity costs moving forward.

The conversion process takes “just minutes,” according to the press release, and the company also provides a “How To” video that guides customers through the installation process. Brightline also offers a disposal program for the outdated fixtures, as well as a $75 refund for each unit.

“Brightline’s LED upgrade solution helps fulfill our core principle of providing the best economic and technical solutions to our partners, with minimal impact on the growing energy demands of our global environment,” said Kathy Katz, Brightline Co-Founder. “Upgrading to LED brings with it a full spectrum of benefits including reduced energy consumption, extended lifetime, lower operations and maintenance costs, and enhanced aesthetics. Brightline is proud to offer this kit which enables our video lighting partners to easily make the move to LED.”

The kit comes with “a new fixture back, front cartridge, diffusion, mounting bracket, and all necessary screws. The user merely needs to supply a Phillips screwdriver and wire cutters,” according to the press release. The new LED fixture offers improved performance, richer color saturation and standard DMX dimming controls. The new fixture is also compatible with existing accessories like mounting yokes, power cables and control screens.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.