Brightline Debuts Fluorescent-to-LED Conversion Kit

Video lighting systems solutions provider Brightline recently announced the debut of a retrofit package that lets users upgrade Brightline S1.2 or S1.4 fluorescent studio fixtures to LED fixtures. The conversion kit allows users to make the switch for only a quarter of the full fixture cost, according to a news release, and can help educational institutions save money on electricity costs moving forward.

The conversion process takes “just minutes,” according to the press release, and the company also provides a “How To” video that guides customers through the installation process. Brightline also offers a disposal program for the outdated fixtures, as well as a $75 refund for each unit.

“Brightline’s LED upgrade solution helps fulfill our core principle of providing the best economic and technical solutions to our partners, with minimal impact on the growing energy demands of our global environment,” said Kathy Katz, Brightline Co-Founder. “Upgrading to LED brings with it a full spectrum of benefits including reduced energy consumption, extended lifetime, lower operations and maintenance costs, and enhanced aesthetics. Brightline is proud to offer this kit which enables our video lighting partners to easily make the move to LED.”

The kit comes with “a new fixture back, front cartridge, diffusion, mounting bracket, and all necessary screws. The user merely needs to supply a Phillips screwdriver and wire cutters,” according to the press release. The new LED fixture offers improved performance, richer color saturation and standard DMX dimming controls. The new fixture is also compatible with existing accessories like mounting yokes, power cables and control screens.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.