New, $163M Middle School to Open in Massachusetts

A new middle school in Weymouth, Mass., is ready to welcome students for the new academic year. Maria Weston Chapman Middle School covers 252,000 square feet and will play home to more than 1,400 students sixth- through eighth-graders, according to a press release. Weymouth Public Schools partnered with BOND Building Construction, Inc. for construction and with HMFH Architects for the project’s design. A ribbon-cutting ceremony was held on Aug. 6 to celebrate the grand opening, and the first day of school is Sept. 6.

“Our team is honored to have worked on such an innovative building and one so vital to the community of Weymouth,” said Frank Hayes, BOND Building Construction President. “Over many months of collaboration, planning and hard work, we’ve been able to deliver an institution that will help foster a meaningful learning environment and create the best possible experience for all students who walk through its doors.”

Weymouth Chapman Middle School
Rendering Courtesy of HMFH Architects

Chapman Middle School contains three academic wings as well as lab spaces, maker spaces, and a central space known as the “Town Square.” The Square will function as the school’s dining hall and a general circulation space, and it also features a professional performance theater space with a capacity of 840.

“Hearing the pride and the way that people spoke about Chapman, we took as part of our mission to design the new Chapman with that level of love, care and enthusiasm so that great learning can happen here—and so that, one day, it can serve as a symbol of this community,” said Matt LaRue, HMFH Project Designer.

The school’s website reports that the previous facility for Chapman Middle School was facing mounting repairs and deferred maintenance issues. The new facility features amenities like 45 general classrooms; 21 science classrooms; 13 test prep rooms; a 10,000-square-foot gymnasium; four lab spaces for STEM, PBL, computer and technology programs; a 4,000-square-foot media center; outdoor play and learning spaces; and a Therapeutic Learning Center (TLC).

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.