Princeton Theological Seminary Restores 1800s-Era Residence Hall

Princeton Theological Seminary in Princeton, N.J., recently completed the restoration of the second-oldest residence hall on campus, according to a news release. The college partnered with Voith & Mactavish Architects LLP (VMA) to modernize Brown Hall, built in 1864. The work covered 46,500 square feet and included interior renovation and exterior rehabilitation, selective demolition, civil work, and landscaping, the news release reports.

The building’s new design exchanges the traditional dorm layout (double-occupancy rooms and communal hallway restrooms) for individual bedrooms featuring private bathrooms. Each floor has a lounge area for group study and socializing, featuring furniture made of wood salvaged from the restoration process. The first floor includes a central lounge area and a kitchenette. Additions also include new lighting fixtures, a new elevator, window blinds, and tiled bathroom floors, according to the news release.

Exterior renovations include a new portico on the north façade and an additional entrance to link the residence hall to the rest of campus, creating a central quad area. The roof now features removable dormers that allow easier access to updated MEP and fire-protection systems. The building has also been updated for accessibility, featuring new ramps with handrails leading to the main entrance.

Princeton Theological Seminary partnered with structural engineer Keast & Hood, MEP engineer Ewing Cole, civil engineer Van Note-Harvey Associates, landscape architect ML Baird & Co. and general contractor Irwin & Leighton.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).