Denver School District Debuts New PreK–8, Project-Based Learning Environment

Mapleton Public Schools in Denver, Colo., recently announced the completion of a design-build redevelopment in partnership with The Neenan Company, according to a news release. Valley View Innovation School, originally built in 1959 as a K–5 facility, underwent a 60,000-square-foot redevelopment and will now serve as a project-based learning environment to students in grades PreK–8.

The new facility includes amenities that the original didn’t, including a gym, art room, cafeteria, music room, science room, and preschool classrooms. The school’s curriculum will structure its academic year around three or more multidisciplinary projects, each addressing Colorado’s academic standards, the news release reports. Parents will also be able to select the school’s educational approach to their child to ensure the most compatible learning environment.

Valley View Innovation School
Photo courtesy of Michael Robinson Photography

“The transformation of Valley View Innovation School will help empower students to steer their educational experiences, developing a lifelong appreciation for curiosity and active learning,” said Brian Carnahan, The Neenan Company architect. “Mapleton’s visionary choice-based model showcases what we believe is possible for the future of educational facilities when we focus on the individual needs of students and their various learning styles. At the core of each of our education projects is our ability to transform our clients’ visions into realities in order to elevate communities.”

The school is divided into three pods, each featuring four flexible classrooms, and also includes two immersion studios for activities like music, science, arts, cooking, technology, and robotics. Other design features include a lobby/reception area; a recreation center featuring parkour equipment; a half-court area for gym classes; and overhead doors that open into a covered outdoor learning space.

The school is open to PreK–2 students for the current academic year. Each year, it will add grade levels to meet community needs until reaching its full capacity of 482 students. Construction began after the facility closed at the end of the 2018–19 school year. The project was funded through a 2016 community-supported bond and a $17-million Building Excellent Schools Today (BEST) grant from the state of Colorado.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.