Missouri University Selects Builder for Protoplex Building

Missouri University of Science and Technology in Rolla, Mo., recently announced that it has selected the construction manager at risk for its upcoming Protoplex building. PARIC Corp. will spearhead the new facility that will become the anchor of the university’s Manufacturing Technology and Innovation Campus. The Protoplex building comes with an estimated price tag of $53.4 million and will cover 116,000 square feet, according to local news.

A news release reports that the facility will connect federal, state, and industry agencies alongside colleges and universities throughout the state. “The Missouri Protoplex will be the headquarters for a state-wide ecosystem where experts, innovators, small and large businesses, entrepreneurs, educators, and policy-makers develop and adopt the technologies needed to create and sustain manufacturing jobs throughout the state,” according to the press release.

The space is set to include labs and shop spaces, high-bay and double-height labs, meeting and collaboration spaces, storage, administrative space, display spaces, and a lobby area. The university is also partnering with Mackey Mitchell Architects, Perkins&Will Architects, and McClure Engineering. Construction is scheduled to start during summer 2023.

According to the university website, the facility is designed around the manufacturing industry’s four fundamental disciplines: materials, manufacturing & methods; pre-production testing & development; the forge-steel and advanced metallurgy; and cyber-physical systems security, testing & development. The Protoplex building will offer space and equipment across its offices, labs, and research and production facilities for each facet.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.