ABM Offers $3.7M in Energy Savings to Georgia School District

Facility solutions provider ABM recently announced that it will be partnering with the Dooly County School System in Vienna, Ga., to form an Energy Performance Contracting program. The program will save the school district about $3.7 million in energy and operating cost savings over the next 20 years, according to a press release. The savings will come primarily from energy-saving infrastructure solutions and custodial and maintenance services.

“Our students deserve state-of-the-art facilities,” said Dooly County School System Superintendent Dr. Craig Lockhart. “This project, through an innovative solution, helps our community achieve more for each school, to perpetuate success for every student.”

The energy savings and reduction in operating costs will come through improved lighting, HVAC equipment, and controls at the district’s K–8 Academy and high school. It will also offer larger space for bus maintenance and upgrades to student athletic facilities such as additional bathrooms, new lighting, and improved playing surfaces. The project will also entail installing a new roof for the high-school gymnasium and a reconfigured HVAC system to extend the roof’s life and offer interior climate control.

“We not only improve infrastructure through projects like this for our clients, but we also protect and preserve those investments for students, teachers, and staff with ongoing maintenance and custodial services,” said ABM President of Education Valerie Burd.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Porter Family Center

    Porter Family Center for Innovation and Academics

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Porter Family Center for Innovation and Academics has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.