Greenheck Introduces AER Configurable Condenser Fan

Greenheck, a national supplier of air movement, air control, and air conditioning equipment, recently introduced its new AER direct drive configurable condenser fan, according to a press release. The unit offers temperature regulation and can provide ventilation for pre-existing equipment, including situations that require enhanced water and temperature protection.

The unit comes in four sizes ranging from 20 to 36 inches. It also provides a performance of up to 29,800 cfm and an external static pressure of up to 2.80 in. wg, the news release reports. According to the product description on the Greenheck website, “The configurable condenser model AER is designed for clean-air applications including tempered air systems, dedicated outdoor air systems (DOAS), mission-critical, and data-center management. Motor protection available up to IP55 and can operate up to 60°C [140°F] ambient temperature. Fan features galvanized steel construction, fabricated steel or cast aluminum propellors, and alternating-current (AC) or electronically commutated (EC) motor options.”

The news release also reports that the product is AMCA-certified for Sound and Air Performance, as well as UL/cUL 705 Listed.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.