Kraus-Anderson Finishes $21.4M, Two-School Renovation Project

Kraus-Anderson in Duluth, Minn., recently announced that it has completed a $21.43-million addition and remodel of two facilities for Ely Public Schools in Ely, Minn. The district consists of Ely Memorial High School and Washington Elementary School, which serve a combined total of about 550 students, according to a news release. The project involved 110,500 square feet of renovation work total, including a 71,000-square-foot remodel of the two schools, according to a news release.

“The project added a new 39,000-square-foot commons area that creates a connection link between the high school and the elementary school,” said Todd Erickson, senior project manager at Kraus-Anderson. “The area also contains a safe and secure entry system, school district offices, and high-school and elementary offices.”

Ely Public Schools Renovation Addition
Image courtesy of Shore to Shore Communications, Inc.

The new space includes CTE classrooms, a media center, gymnasium, music room, metals shop and wood shop, and a new cafeteria with upgraded kitchen equipment, the news release reports. The high school gained new boys’ and girls’ locker rooms, the elementary school a new Early Family Childhood Education (ECFE) area, and both received new HVAC systems.

Construction started in May 2021, and the school district also partnered with Architectural Resources, Inc., for the design.

“In addition to budget, staffing, and supply-chain challenges brought about by COVID-19, crews discovered 1,700 cubic yards of ledge rock, which had to be blasted and excavated to allow installation of new utilities,” Erickson said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Addressing the Housing Affordability Crisis Through Creative Campus Development

    Many Southern California college and university campuses are living amidst surging housing costs, driving the need to house more of their populations on campus. Especially for community colleges, the need to support millions of unhoused and housing insecure students has become a prominent issue that lawmakers and institutions alike are trying to solve.

Digital Edition