Amherst College to Construct Lyceum

Bruner/Cott Architects recently announced that their latest project at Amherst College in Amherst, Mass., is currently under construction. The Aliki Perroti & Seth Frank Lyceum measures in at 20,000 square feet and has an estimated completion date of fall 2023, according to a project narrative.

The Lyceum will unite the college’s Center for Humanistic Inquiry (CHI), the history department, and other faculty members in spaces designed to foster collaboration and interaction among the university’s population at large. Features of the project include a historic house renovated to include offices, support spaces and classrooms; a two-story addition featuring an event space and flexible classrooms; a three-story office wing; an event space on the ground floor; and an outdoor terrace providing a central common area.

Amherst College Lyceum Rendering
Image courtesy of Bruner/Cott Architects

The Lyceum is designed with sustainability in mind to line up with Amherst’s commitment to carbon neutrality by 2030. The low-carbon construction will make use of materials like wood and plant-based materials. The building will be airtight and feature efficient HVAC systems as well as daylighting and scenic views of the campus, the project narrative reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.