Nonprofit Releases Renderings for New Uvalde Elementary School

Local news reports that the nonprofit organization planning a new elementary school for Uvalde, Texas, recently released renderings of the new facility. Robb Elementary School, the site of the school shooting that left 19 students and two teachers dead in May 2022, is scheduled for demolition, according to local leaders. The replacement facility is scheduled for completion in 2024 and will have a capacity of 800 students, according to KENS. The new facility will measure in at about 120,000 square feet, about twice the size of the existing campus.

“We haven’t had a new school in Uvalde since 1985,” said Uvalde Precinct 4 Judge Lalo Diaz. “So whatever we are going to give them is state-of-the-art.” Local news reports that Diaz is the co-chair of a committee comprised of educators, parents, and first responders who are collaborating with architects on the new school. Diaz also served as the coroner on the day of the mass shooting.

The new school’s design places a heavy emphasis on security. The executive director of the Uvalde CISD Moving Forward Foundation, Tim Miller, described security features and additions upon the design’s release. They include fencing around outdoor play areas, keyless entry, 9-foot privacy gates, a secure area for visitors near the building’s entrance, and a new road to provide first responders with quicker access to the school.

Other features include an air-conditioned gymnasium, two playgrounds, and an outdoor courtyard.

“We have had conversations about bullet-resistant film, especially on the windows that serve as the perimeter,” said Natalie Arias, co-chair on the advisory committee and the academic dean at Uvalde High School.

Diaz also revealed that the new school would pay tribute to the 21 victims of the shooting at Robb Elementary, although the specifics of the design are still in development. Local news reports that a separate committee will soon meet to come up with the new school’s name, and the foundation will host another meeting with completed schematics on March 20.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Addressing the Housing Affordability Crisis Through Creative Campus Development

    Many Southern California college and university campuses are living amidst surging housing costs, driving the need to house more of their populations on campus. Especially for community colleges, the need to support millions of unhoused and housing insecure students has become a prominent issue that lawmakers and institutions alike are trying to solve.

Digital Edition