California District Breaks Ground on Total Campus Replacement

The West Contra Costa Unified School District (WCCUSD) recently reached the groundbreaking milestone for a total campus replacement project for an elementary school in San Pablo, Calif. The new Lake Elementary School will have the capacity for almost 500 students between transitional kindergarten (TK) and sixth grade, according to a news release. The district is partnering with Quattrocchi Kwok Architects for the building’s design and Alten Construction Inc. for construction.

“We are thrilled to see our community and faculty vision come to fruition, said WCCUSD Superintendent Dr. Chris Hurst. “We have long sought a campus that enhances Lake Elementary School’s educational programs, supports the needs of the community and will be a source of pride for students, parents, and staff. We are grateful to partner closely with our project team, whose guidance and expert knowledge has been instrumental in navigating complexities while remaining on budget.”

According to the news release, the new facility’s front entrance will contain administrative offices and the school library, which will play home to community events on nights and weekends. Students in first through sixth grade will be based out of learning suites that consist of individual classrooms that open into a larger, communal space. Kindergarten and TK classrooms will be separated from the older grades and share outdoor play areas. The new campus will also feature a multipurpose building with space for food service, indoor and outdoor eating spaces, and space for performances.

“We’ve collaborated closely with the district to cultivate an entirely reimagined Lake Elementary School campus—one that will support and advance the school’s needs beyond that of the old classroom walls,” said QKA Principal and CFO John Dybczak. “Our trusted design-build partnership with Alten Construction was invaluable as we navigated the serious challenges associated with demolishing and rebuilding a school campus while prioritizing safety and uninterrupted learning throughout the process.”

Sustainability features include a cool roof and architectural materials and finishes made up of recycled content. The building also features energy-efficient MEP equipment like LED lighting and low-flow plumbing. The outdoor spaces make use of drought-tolerant landscaping, synthetic turf, and shade coverings for outdoor dining and playgrounds to reduce water use.

Construction will take place in two phases and has an estimated completion date of summer 2025.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • KnowBe4 Releases Report on Education Sector’s Preparedness for Cyberattacks

    Cybersecurity platform KnowBe4 recently released a new research report titled “From Primary Schools to Universities, The Global Education Sector is Unprepared for Escalating Cyber Attacks,” according to a news release.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

Digital Edition