ASU Board of Trustees Approves $8M Nursing Building

The Arkansas State University System Board of Trustees recently approved the construction of a new nursing building at its Three Rivers campus in Malvern, Ark. The university received $8 million in federal funding for the project through the Fiscal Year 2023 year-end spending package pushed by U.S. Senator John Boozman, according to a university news release.

The new facility will measure between 22,000–25,000 square feet and feature four simulation labs with control rooms, an obstetrics room, a pediatric room, and two adult medical-surgical nursing spaces, the news release reports. It will also feature two 50-student computer labs and a 150-seat auditorium.

“We deeply appreciate Senator Boozman’s efforts to secure funding for ASU Three Rivers’ nursing program and for the construction of a facility to provide academic excellence for healthcare in Arkansas,” said ASU Three Rivers Chancellor Dr. Steve Rook.

The Arkansas State Board of Nursing (ASBN) recommended a larger facility to keep up with student enrollment during a site visit in 2019. The university’s current health science facility measures in at just 11,000 square feet.

“ASU Three Rivers has a longstanding tradition of preparing students to enter the workforce as professionals in the healthcare and health science fields,” said Vice Chancellor for Academic Affairs Pat Simms. “The College’s Practical Nursing program is one of the College’s oldest programs, producing more graduates than any other since the school’s inception.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.