Houston-Area K–12 District Breaks Ground on New CTE Center

The Brazosport Independent School District in Freeport, Texas, recently held a groundbreaking ceremony for a new Career and Technical Education (CTE) Center at Brazosport High School, according to a news release. The 76,000-square-foot facility is being funded through a 2019 bond and has an estimated completion date of December 2024. The district partnered with VLK Architects for the building’s design.

“VLK is very fortunate to have partnered with Brazosport ISD in the design of the Brazosport High School CTE Center,” said VLK Architects Principal Monika Castillo. “The new building and addition will allow the district to continue delivering instruction for the betterment of their students’ futures.”

The new building will connect directly to the main school and offer specialized spaces for programs including cosmetology, floral design, veterinary technology, journalism, and others. It will also feature workshops for welding, architectural engineering, and construction, each with a dedicated classroom space and shop area with access to an outdoor, secured workspace. The new spaces were designed to include natural light and exterior finishes that complement the rest of campus.

The news release reports that the cosmetology lab will include installations for hair styling, pedicures and manicures, and facial treatments, while the vet tech lab will have space for animal treatment and grooming. The facility will also include a podcast room, green screen room, and control room for the school’s AV and multimedia production programs.

“Our new Career and Technical Education building will serve as a hub of innovation, fostering creativity, collaboration, and hands-on learning,” said Brazosport ISD Superintendent Danny Massey. “This facility will provide our students with access to cutting-edge technology, modern workshops, and industry-standard equipment across a wide range of disciplines. Together, we will build not only a physical structure for our students today, but also a legacy of excellence for generations to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.