Ohio State University Approves Two Major Construction Projects

The Board of Trustees at Ohio State University in Columbus, Ohio, recently approved two major construction projects on education and research facilities, according to local news. At its May 18 meeting, it approved contracts for the renovation of Campbell Hall—part of the College of Education and Human Ecology—as well as Phase 2 of the new Biomedical and Materials Engineering Complex (BMEC) for the College of Engineering.

 BMEC Phase 2 will cost $90 million and measure in at 125,000 square feet. Phase 1 of the project, the Mars G. Fontana Laboratories, was completed in August 2020 and united the Biomedical Engineering and Materials Science and Engineering Departments. Phase 2 of the project, nicknamed “The Gateway to Engineering,” will include amenities like STEM-focused teaching labs, a Leadership Suite for College of Engineering Leadership, and space for the materials research group from the Department of Electrical Engineering. The new facility is scheduled for completion in Sept. 2025.

Meanwhile, the Board also approved the last $49 million for the $61.2-million renovation of Campbell Hall, home to the College of Education and Human Ecology. Funding is coming from private donations, state-awarded funds, and university funds, according to a university news release. Completion is scheduled for June 2025.

“This supports the College of Education and Human Ecology’s educational goals and admissions by providing an updated space for collaborative work and a hands-on learning environment,” said Mark Conselyea, Facilities Operations and Development vice president. “The project renovates 115,000 square feet of existing offices, research and computer labs, a teaching kitchen, and classrooms.”

Local news reports that the university is also finishing construction on a number of projects scheduled to open in coming months. The five-story Pelotonia Research Center celebrated a ribbon-cutting ceremony earlier this month. Renovations to Newton Hall, part of the College of Nursing, will debut in June. The James Outpatient Care facility—an outpatient cancer research and treatment facility—is planned to open in July. Construction on the university’s new Arts District will finish with the completion of the new Department of Theatre, Film, and Media Arts building scheduled to open in time for the fall. And the 66,000-square-foot Energy Advancement and Innovation Center is anticipated to open in October.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition