Tennessee University Starts Construction on New Engineering Facility

Middle Tennessee State University recently announced that construction of a new Applied Engineering Building has begun on its campus in Murfreesboro, Tenn., according to a news release. The facility will play home to the university’s Engineering Technology and Mechatronics Engineering programs, and it will also include space for future programs as industry needs develop and change. The university partnered with Wold Architects and Engineers and Cooper Carry for the project’s design.

The new facility will stand three stories and cover 90,000 square feet. It will include amenities like flexible learning and lab spaces; lobbies that will feature student projects and technology displays; gathering areas; and lecture space for academic instruction, guest speakers, student organizations, and special events, the news release reports. It will also offer research laboratory space to both students and faculty to support emerging technologies as well as experiential and integrative learning.

“[The Applied Engineering Building] represents a new phase in the life of the department—a progression into a new era of possibilities for our faculty and students,” said Greg Van Patten, Dean of the College of Basic and Applied Sciences. “It will completely alter how the faculty in the Engineering Technology Department will teach and how our students will learn. The cutting-edge facilities and new equipment will provide opportunities for our faculty to pursue research projects that are not possible at MTSU today which will, in turn, help us continue to attract and retain the very top-talented students and faculty.”

According to local news, the project comes with a budget of $74.8 million and is scheduled for completion during summer or fall of 2025. University President Sidney A. McPhee said that the project “will be the finishing touch to what we’ve named the Science Corridor of Innovation that began in 2014 that began with the opening of our $147-million Science Building, the single largest investment by the state of Tennessee for an academic facility.”

The new facility will also contain at least $1.2-million in new or donated technology, according to McPhee and Engineering Technology Chair Ken Currie. Equipment will include the Dexcom/Automation Nth FlexBases, the Gould Mechatronics Robotics lab, and the Co-Bot Workplace Development Center, according to local news.

A groundbreaking ceremony took place on June 20 to celebrate the beginning of construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition