Wenger Launches LED Light Fixture

Music and theater education solutions company Wenger Corporation recently announced the launch of the Novara LED light fixture, according to a news release. The product was intentionally designed as a retrofit for Diva Acoustic Shells, allowing venues to upgrade light fixtures within those shells to save on electricity costs without replacing the entire setup.

The news release reports that Novara serves as the only LED fixture designed as a 1:1 replacement for incandescent fixtures installed in the existing Diva Acoustical Shells. The LED bulbs offer comparable beam angles and lumen output to provide shell lighting of performance spaces at a more sustainable cost.

Novara LED Fixture
Photo Courtesy of Wenger Corporation

The Novara LED fixture offers a brightness of 6,800 lumens to fully illuminate the venue’s stage area. The new fixtures are also silent, lacking any buzzing or humming noises that might distract from a performance. The energy-efficient bulbs exude minimal heat and no ultraviolet or infrared radiation. They can also save organizations up to 86% on electricity costs and consumption.

The fixtures are individually controllable and addressable using DMX/RDM or mains dimming technology. The two-axis beam positioning allows for easy adjustability and fine-tuning to tailor it to a given performance. The bulb also has a lifespan 35 times as long as its predecessor, reducing both maintenance times and replacement costs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition