University of Cincinnati Plans Demolition, Replacement of Campus Landmark

The University of Cincinnati in Cincinnati, Ohio, recently announced plans to demolish and replace campus landmark Crosley Tower, according to local news. The 16-story concrete structure is set for to come down beginning in January 2026 to make room for a new academic and research facility.

The new facility is part of a $240-million project outlined in recently filed bidding documents that will rearrange and improve a variety of teaching and research spaces around campus. According to Local12 news, construction on the new building will begin in January 2027 and has an estimated completion date of June 2029.

The university’s Office of Planning+Design+Construction determined that repairs to Crosley Tower—which was built in 1969—would be too difficult, reports Cincinnati.com. The tower houses labs for chemistry and biology classes. Work will take place in three phases. The first is to abate the presence of asbestos, mercury, and lead; the second is demolition; and the third is new construction. Construction has an estimated budget of $215 million.

Local news reports that the university has been considering the decision to demolish the building for about five years. The building was at 50% capacity in 2018, when the university issued a timeframe of tearing it down within the next five to ten years. In 2020, the university reported that demolition could start as soon as 2025.

According to the bidding documents, the program’s objectives include the creation of new flexible, open-bay experimental research labs and supporting research facilities; new flexible teaching labs; new standardized researcher and faculty offices; new general-purpose, centrally scheduled classrooms; and student success and collaboration spaces.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition