UAB Completes Phase I of STEM Complex Construction

The University of Alabama at Birmingham recently announced that the first phase of construction on a new Science and Engineering Complex is complete, according to a news release. The university is partnering with Hoar Construction on the three-phase project, which will unite all of the university’s basic science undergraduate and graduate programs underneath one roof. Phase I consists of a 138,842-square-foot, four-story facility featuring labs and classrooms for biology, chemistry, and physics, as well as administrative space.

“We are proud to deliver this project to the students, faculty, and staff at UAB, as the new Science and Engineering Complex represents a significant commitment to advancing the university’s prowess as a key research hub that enhances career opportunities and bolsters economic development across Alabama,” said Chad Holland, project executive at Hoar. “This project was completed at the highest quality for the next generation of students, leaders and innovators within science and engineering. Hoar remains steadfast in our commitment to build top-tier projects across all realms of higher education, and we are honored to contribute to the university’s growth in our hometown of Birmingham.”

The facility was designed as a team-learning environment that will promote student collaboration between both students and faculty in different scientific disciplines. Specialized workspaces include an optics lab, research labs for student shadowing, and cold-growth environment rooms.

The news release reports that Hoar used computerized, 3D models of the structure to address design concerns during the construction process. The models were used to assess material quantities, optimize item placement, and identify design conflicts. Additionally, Building Information Modeling (BIM) were used to streamline the installation of plumbing and electrical components to save both time and cost.

The university is also partnering with lead architect Goodwyn, Mills & Cawood for the building’s design, as well as Lord Aeck Sargent (LAS) for lab and research space consulting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.