Schools In Focus: New Acoustical Solutions — From the Top Down

Schools In Focus is a podcast dedicated to the design, planning and management of educational facilities and campuses. Listen in as we chat with industry experts, facility managers, architects, security and safety professionals, and other thought leaders. Catch up on previous episodes here.

Increased understanding of and focus on acoustics in the classroom, coupled with heightened focus on speech privacy and information security in today's world, has placed additional burden on school administrators and facility managers. Acoustics isn't only about creating quite classrooms. It's a critical part of the overall IEQ of a school—from classrooms to nurses' offices to administration spaces. New and better technologies exist to give schools solutions that achieve what is needed in today's world while keeping budget parameters in mind. These acoustical solutions start at the top with ceilings, and not all ceilings are alike. Join us as Sean Browne, Senior Manager of Research & Development for Armstrong World Industries, walks us through choosing the right ceiling to optimize acoustics for better learning experiences.

Schools In Focus, Episode 36: New Acoustical Solutions — From the Top Down

 

Where to Listen

Schools In Focus is available on Apple Podcasts, Spotify, Google Podcasts, and Amazon Music. Subscribe today, or listen below!

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • William Penn Charter School

    Richard A. Balderston OPC’69 Lower School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Richard A. Balderston OPC’69 Lower School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.