California State University, Northridge Starts Construction on New Student Housing

California State University, Northridge (CSUN) in Northridge, Calif., recently began construction on a new student housing complex that will add room for 198 beds to its campus, according to a news release. The project consists of two four-story buildings and will cost an estimated $55.7 million. The new facility is scheduled to open in fall 2025.

The new complex, to be known as Buildings #22 and #23, will cover 60,290 square feet, 30,000 square feet of which will be housing space. The residential floors will consist of dual-occupancy student rooms, one bathroom per four students, and one suite-style living room per floor, the news release reports. Building #22 will feature student community spaces, study rooms, and a multi-purpose room. Building #23 will offer student housing administration space and mail services. Both buildings will feature a central elevator, building services, and secure access.

The university partnered with C.W. Driver Companies for the building’s construction and AC Martin Partners for architecture and design.

“C.W. Driver is ideally suited to help CSUN with this student housing addition,” said C.W. Driver Companies COO Brent Hughes. “In our many years of construction, we’ve worked on several schools and universities, including the Freshman Student Housing, Student Recreation Center, Physical Education Building, and Valley Performing Arts projects on the CSUN campus, providing us extensive campus knowledge and experience necessary for the construction.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.