Construction Begins on New Campus for California Community College

The design-build team of Blach Construction, Quattrocchi Kwok Architects, and Gensler recently began construction on a brand-new campus for the Gavilan Joint Community College District in Hollister, Calif., according to a news release. Gavilan was originally founded in Hollister in 1919.

“Our new Gavilan College San Benito County campus will greatly improve access to higher education in Hollister, San Juan Bautista, Tres Pinos and other rural county areas,” said Gavilan Superintendent Pedro Avila. “Approximately 2,000 of our currently enrolled students live in Hollister and other San Benito County areas. This decades long-awaited campus fulfills our vision of expanding academic opportunities to these communities to support upward mobility.”

The first phase of construction consists of a 34,000-square-foot campus core that will include “a lobby and welcome center, classrooms, science and computer labs, learning resource and testing centers, a café, community room, as well as administrative and support spaces.” The building will also include an intentional exterior design that will blend it into its rural setting. The space also boasts a future-ready design that can accommodate current and future technology and furniture needs.

Phase 1 also includes a hardscape entry plaza, outdoor learning spaces, landscaping, and parking amenities. The project will cost $60 million, and funding comes from Measure X, which was passed by San Benito and Santa Clara County voters in 2018. Completion is scheduled for fall 2024, according to the news release.

“This is a milestone project to be sure. Not every day do we have an opportunity to enhance a deserving community with an entirely new, much-desired community college campus, let alone partner with two renowned education designers and an inclusive client to do it,” said Blach Construction project director Brad Fannin. “We are thrilled to be leveraging our extensive design-build expertise, integrating seamlessly with our partners to ensure the Gavilan San Benito County Campus project remains on schedule, within budget and when complete, exceeds the higher education needs of students in and around the greater Hollister area.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.