California K–12 District Debuts Reconstructed High School

The Mendocino Unified School District (MUSD) in Mendocino, Calif., recently completed a renovation and modernization project on Mendocino High School, according to a news release. The “near-total reconstruction” included updates to educational and student spaces, energy conservation, and the incorporation of all-electric features to be paired with renewable energy sources in future phases. The district partnered with architecture firm Quattrocchi Kwok Architects (QKA), builders Lathrop Construction Associates, and construction management services from Donald Alameida, the news release reports.

The campus was originally built in the 1940s, and the “down-to-the-studs” modernization replaced fossil-fuel-powered equipment like diesel boilers and propane water heaters with electric heat pumps, as well as a gas-powered kitchen with electric cooking surfaces and ovens. The next phase of construction will entail on-site solar panels and a batter backup system. The building also features wall and roof insulation, double-glazed windows, and modern roofing materials to help regulate indoor temperatures.

“We are delighted that beyond meeting essential educational and environmental criteria, the redesign of the building gave us a campus that blends beautifully into the townscape of our historic community,” said Tobin Hahn, MHS Principal. “The ideals that have exemplified Mendocino High School through the decades—collaboration, relationships, diverse academic offerings and surrounding natural beauty—were all incorporated into the redesign. We are grateful to our thoughtful, creative project team for delivering a school that will embody these ideals into the future.”

Phase 1 of the project cost $15 million and was funded through Measure H, which voters passed in 2020. Renovations included the addition of active learning environments with breakout spaces; new data systems and upgraded technology; connection to outdoor learning environments; two new science labs; a new Student Union building; and a new kitchen, the news release reports.

“This is the most significant MHS campus improvement project since 1940, and it holds particular meaning for me as a former student and district architect since 1989,” said Mark Quattrocchi, FAIA, Founding principal of QKA Architects and Mendocino High School alumnus. “I applaud the district—and the community’s tax-payers—for prioritizing climate-saving technologies and design features. This, coupled with inspired learning spaces that will benefit students’ educational experiences for decades to come, makes MHS a true passion project for all involved.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UT-Austin Breaks Ground on 17-Story Business School

    The University of Texas at Austin recently broke ground on a new, 17-story facility that will serve as the new home for the school’s McCombs School of Business, according to university news. The groundbreaking ceremony took place on April 10 for Mulva Hall, which will include amenities like classrooms, academic department suites, research centers, faculty offices, the dean’s office, and gathering spaces.

  • KnowBe4 Releases Report on Education Sector’s Preparedness for Cyberattacks

    Cybersecurity platform KnowBe4 recently released a new research report titled “From Primary Schools to Universities, The Global Education Sector is Unprepared for Escalating Cyber Attacks,” according to a news release.

  • Greenheck Launches Optics Sensors for Kitchen Hoods

    Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

Digital Edition