Prairie View A&M University Debuts New Academic Building

Prairie View A&M University in Prairie View, Texas, recently opened a new, three-story Engineering Classroom and Research Building (EnCARB), according to a news release. The 106,000-square-foot facility provides academic, research, and technical space for the university’s Roy G. Perry College of Engineering. The university partnered with integrated design and engineering firm Stantec for the project.

The new building features more than 30 labs for chemical, civil engineering, and mechanical departments, as well as multidisciplinary research in fields like space exploration, data analytics, robotics and artificial intelligence, 3D manufacturing, and more. It also includes built-in flexible spaces to support different pedagogies and a maker space.

“EnCARB will allow PVAMU to take their laboratory instruction and research pursuits to the next level with state-of-the-art facilities that are flexible by design and will allow them to be nimble and adapt in the fast-evolving field of engineering,” said Stantec principal Cynthia Labelle. “Students will learn and grow across many engineering disciplines in a future-focused learning environment.”

EnCARB will also be one of a small number of U.S. facilities to feature a microgravity drop tower for research regarding space-related conditions. Stantec has previously completed STEM-related facilities at universities like Yale, the University of Texas at Dallas, Central Michigan University, and the University of Texas at Permian Basin, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.