Florida Net-Zero High School Completes $29M Expansion Project

NeoCity Academy in Kissimmee, Fla., recently completed a 53,000-square-foot, three-story addition to its campus, according to a news release. The school partnered with construction firm Skanska on the project, which includes 26 new classrooms with collaborative learning spaces and labs. NeoCity Academy was the first net-zero high school campus in the state of Florida, the news release reports.

The expansion includes sustainability features like a photovoltaic canopy that provides solar energy as well as shade and shelter, LED lighting, and designated space for future rooftop solar panels. The project also involved detailing and expanding the school’s building envelope to reduce air leakage and control temperature, air, and humidity. Window placement and sizing were also taken into account to minimize the school’s energy use and heat gain.

“We’re excited to deliver this sustainability-focused expansion to NeoCity Academy and the School District of Osceola County,” said Skanska Vice President Daniel Abou-Jaoude. “This project is a testament to Skanska’s commitment to construct innovative and forward-thinking educational facilities throughout the state.”

The project also features a photovoltaic “mixer” space that acts as a gathering space for faculty and students. Other site improvements include a new canopy and covered walkway that create both outdoor learning spaces and increased accessibility between buildings, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition