Sloan Launches Company’s First Line of Bottle Fillers, Water Coolers

Commercial plumbing systems manufacturer Sloan recently announced the launch of Sloan DropSpot, the company’s first line of bottle fillers and water coolers, according to a news release. The fillers come in a stainless steel or black powder-coated finish for placement in commercial or educational environments and also include an easy-access filter for maintenance purposes.

The bottle fillers and water coolers meet NSF61 standards, the news release reports, “ensuring there’s no chemicals or contaminants indirectly imparted to drinking water from products, components, and materials used in drinking water systems.” The 3,000-gallon filters reduce PFOA, PFOS, chlorine, lead, and other contaminants. The filter also complies with NSF53, NSF42, and NSF401, confirming the reduction of contaminants.

Sloan DropSpot comes in three configurations, each with the options of filtered or unfiltered: an on-wall bottle filler, an on-wall bottle filler with a single-level cooler, and an on-wall bottle filler with a bi-level cooler. Available accessories include filter upgrade kits, a replacement filter, and a remote chiller for the standalone filler.

“Sloan has a proud history of innovating commercial restroom products designed to preserve water,” said Sloan’s chief sales and marketing officer, Parthiv Amin. “The launch of Sloan DropSpot is a historic day at Sloan, as we extend our water-conscious products beyond the restroom with the same quality and reliability that our customers have come to expect for nearly 120 years.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition