Texas Tech University Celebrates Opening of New Academic Building

Texas Tech University in Lubbock, Texas, recently held a ribbon-cutting ceremony for its new, 130,000-square-foot Academic Sciences Building (ASB), according to a news release. The facility stands three stories and broke ground about two and a half years ago. It plays home to five academic departments in the College of Arts & Sciences: Biological Sciences, Chemistry & Biochemistry, Geosciences, Physics & Astronomy, and Psychological Sciences.

It will also house four core interdisciplinary research labs (human sampling, a clean room, biosafety level 2, and biosafety level 3), as well as academic classrooms, general laboratory and research space, faculty offices, and public gathering spaces, the news release reports. The building’s courtyard includes an IGOR telescope from White Sands Missile Range.

“The Academic Sciences Building is a testament to Texas Tech’s vision for the future while honoring the traditional beauty of our campus,” said Lawrence Schovanec, Texas Tech President. “As the first building to open in our university’s second century, it embodies our commitment to interdisciplinary collaboration, cutting-edge research and exceptional student experiences.”

The project cost $112.5 million, $12.5 million of which came from an appropriation from the Texas Legislature during its 2021 session.

“This space will allow not only existing students to thrive and reach new heights but will have significant impact on our ability to attract future students and additional outstanding faculty,” said Tosha Dupras, dean of the College of Arts & Sciences. “I look forward to two weeks from now, when the hallways, classrooms and labs will be filled with students and faculty.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • CSU Starts Construction on New Engineering Building

    Colorado State University in Denver, Colo., recently began clearing space for the construction of the new Don and Susie Law Engineering Future Technologies Building, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • DLR Group Announces New Mid-Atlantic Higher Education Leader

    Integrated design firm DLR Group recently announced that it has promoted Principal Shawn Gaither, AIA, LEED AP, to the role of higher education leader in the Mid-Atlantic, according to a news release. Gaither has served with the firm for more than 20 years, most recently as the national higher education business development leader.