Kraus-Anderson Completes Three Projects for Minnesota K–12 District

Integrated construction management firm Kraus-Anderson recently announced that it has completed addition projects at three schools within Marshall County Central Schools in Minnesota, according to a news release. Funding came from an $18.9-million building referendum passed by the community in August 2022 to create new space for students and school programs. The district also partnered with Widseth Architects for all three projects’ designs.

Marshall County Central High School will serve students in grades 5–12 starting with the 2024–25 academic year. The 93,559-square-foot addition project included five new classrooms, a new cafeteria, a commons area, a secondary gymnasium, a weight room, and a bus loop. Construction was timed to finish in time for the fall 2024 semester, the news release reports.

Newfolden Elementary, which serves students in grades 2–4, saw the addition of a new library, outdoor basketball court, music room, and parking lot. Construction finished in summer 2023, and indoor remodeling was completed in summer 2024.

Viking Elementary serves PreK students through first-graders. The 17,842-square-foot project features a new front office and secure entrance, a music room, kitchen administrative space, and storage. Remodeling also created space for a school nurse office, library, staff lunch room expansion, and additional preschool space. Construction finished in January, and additional remodeling was finished during summer 2024, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.