Georgia Gwinnett College Construction Project Nears Completion

The Georgia Gwinnett College (GCC) Gateway Building and Infrastructure project in Lawrenceville, Ga., is on track for its November 2024 completion date, according to a news release. The project consists of a new central energy plant and the construction of the university’s first-ever Convocation Center.

The Convocation Center (or Gateway Building) covers a total of 72,280 square feet and includes student services like wellness, recreation, food service, convocation, and events. Meanwhile, the central energy plant will be built in a separate structure and serve the entire campus. Development stems from a 2015 university study on how to coordinate campus utility systems with planned architectural growth. Once complete, the central energy plant will provide chilled water for the Gateway Building and nine more buildings on campus.

The college partnered with architects SSOE Group and Hughes Group Architects, engineer RMF Engineering, and general contractor Carroll Daniel Construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.