Harvard University Breaks Ground on New Performance Venue

Harvard University in Cambridge, Mass., recently announced that construction has begun on a new performing arts center for the campus, according to a news release. The David E. and Stacey L. Goel Center for Creativity & Performance will serve as the new home for the American Repertory Theater (A.R.T.), as well as a wide variety of performances, public gatherings, teaching opportunities, and international research.

The university partnered with Haworth Tompkins as the architect and design lead, ARC/Architectural Resources Cambridge as the architect of record, and Shawmut Design and Construction as the project’s construction manager.

“We are honored to be leading the construction of the David E. and Stacey L. Goel Center for Creativity & Performance,” said Kevin Sullivan, the Shawmut New England region’s executive vice president. “This project exemplifies our deep commitment to the community. By prioritizing environmental sustainability and adaptable design, we are building a vibrant hub for creativity and connection that will serve the local area for years to come. Our shared goal of minimizing embodied and operational carbon, maximizing wellbeing, and enhancing resiliency ensures that this center will not only be a beacon for the arts but also a pioneering global model for sustainable construction.”

The facility will include interconnected and adaptable multi-use spaces to support creativity. It will feature two performance venues: the West Stage for large-scale productions and the East Stage for smaller ones. Other amenities will include naturally lit rehearsal studios and teaching spaces, a large public lobby, an outdoor performance space, dressing rooms and technical shops, administrative offices, and a café, the news release reports.

From a sustainability perspective, the building’s water and electric utilities will be supplied by the university’s new, lower-carbon District Energy Facility. It will also use rooftop solar panels and natural ventilation to reduce energy use, while a green roof and extensive landscaping will help with stormwater attenuation.

Construction has an estimated completion date of 2026, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fort Collins to Convert 1980s Office Park into Junior High School

    The Liberty Common School, a charter-public school in Fort Collins, Colo., recently broke ground on an adaptive reuse project that will convert an 1980s-era office park into a 45,000-square-foot junior high school for seventh- and eighth-grade students, according to a news release.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

Digital Edition