Massachusetts High School to Build New Athletics Facility

Middlesex School, which serves boarding and day students in grades 9–12, recently moved forward with plans to build a new athletics facility for its campus in Concord, Mass., according to a news release. MassDevelopment recently issued a $43.7-million tax-exempt bond to fund the project, which will create an 80,000-square-foot field house building. The bonds were sold through a public offering that was underwritten by Stifel, Nicolaus & Company, Inc., the news release reports.

Amenities will include multi-purpose practice courts, a fitness center, an elevated indoor track, wellness and physical rehabilitation spaces, meeting spaces, locker rooms, and covered parking. The project also entails resurfacing and restoring two turf fields on campus, as well as other capital improvement projects.

“Generations of students will benefit from Middlesex School’s investment in these new and improved athletic facilities,” said Marcos Marrero, MassDevelopment Deputy Director and Senior Executive Vice President. “MassDevelopment is pleased we can be a resource for nonprofit independent schools looking to renovate or expand their campuses.”

The building will be designed according to LEED Silver certifications. The school partnered with CBT Architects for the project’s design, Rimkus for project management, and Erland for its construction, according to the Erland website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Compton High School

    Compton High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Compton High School has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.