College of the Desert Starts Construction on New Campus Location

College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million. The college is partnering with builder C.W. Driver Companies for the project’s construction, which is scheduled for completion in 2027.

The campus will span 27 acres. Its primary facility, The Accelerator, will serve students studying digital media and arts, architecture, and healthcare. Amenities in the facility will include technology labs and maker spaces, flexible classrooms, a film-screening studio, radio station, and café. Other campus facilities are set to include a culinary institute featuring specialized, state-of-the-art kitchen labs; an upscale restaurant, and support facilities, the news release reports.

“This project stands out not only for its sustainable design and technologically advanced learning spaces but also for its role in shaping the Coachella Valley as a hub for education, creativity, and community connection,” said Dave Amundson, Project Executive, C.W. Driver. “Our history of building complex higher education facilities in Southern California has prepared us well for this opportunity.”

Finally, the campus will feature an event center for community use, a maintenance and operations facility, a central utility plant, and a campus transportation and mobility hub. The campus is aiming for LEED Gold Certification; sustainability features will include on-site photovoltaic power generation and energy-efficient design, according to the news release.

The college also partnered with WRNS Studio for the project’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Pangram Secures Funding for AI Detection Technology

    Pangram, which provides technology that detects AI-generated text, recently announced that it has secured nearly $4 million in pre-seed and seed funding, according to a news release. The most recent round of investments, totaling $2.7 million, come on top of the pre-existing seed fund of $1.25 million.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Pfluger Architects Announces Promotions of Seven Staff Members

    Texas-based architecture firm Pfluger Architects recently announced that it has promoted seven staff members to senior-level positions. One of the promotions is that of Dallas-based Senior Project Architect Chad Martin to Principal, according to a news release.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

Digital Edition