College of the Desert Starts Construction on New Campus Location

College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million. The college is partnering with builder C.W. Driver Companies for the project’s construction, which is scheduled for completion in 2027.

The campus will span 27 acres. Its primary facility, The Accelerator, will serve students studying digital media and arts, architecture, and healthcare. Amenities in the facility will include technology labs and maker spaces, flexible classrooms, a film-screening studio, radio station, and café. Other campus facilities are set to include a culinary institute featuring specialized, state-of-the-art kitchen labs; an upscale restaurant, and support facilities, the news release reports.

“This project stands out not only for its sustainable design and technologically advanced learning spaces but also for its role in shaping the Coachella Valley as a hub for education, creativity, and community connection,” said Dave Amundson, Project Executive, C.W. Driver. “Our history of building complex higher education facilities in Southern California has prepared us well for this opportunity.”

Finally, the campus will feature an event center for community use, a maintenance and operations facility, a central utility plant, and a campus transportation and mobility hub. The campus is aiming for LEED Gold Certification; sustainability features will include on-site photovoltaic power generation and energy-efficient design, according to the news release.

The college also partnered with WRNS Studio for the project’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.