Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing. Construction has an estimated completion date of December 2025.

The facility was designed to showcase its mass timber construction, a deliberate move toward reducing the building’s carbon footprint. The goal is to create a warm, high-quality, long-lasting space for students to relax and collaborate. Students participated in the steering committee that guided the new space’s aesthetic.

“This new residence hall demonstrates how Oregon Tech continues to lead in sustainability and innovation while addressing the needs of our growing student community,” said Dr. Nagi Naganathan, Oregon Tech President. “With support from the Oregon Legislature and the Office of the Governor, Oregon Tech is constructing one of the first residence halls in Oregon to utilize mass timber floors and roofs with panelized wood frame walls, and it will serve as a landmark example of carbon-efficient construction in higher education.”

The college is partnering with Bogatay Construction, Inc., also based in Klamath Falls, for the project’s construction. The news release reports that 89% of the project’s work is coming from firms within a 100-mile radius of campus.

“Using prefabricated CLT panels reduces labor, material waste, and the building’s carbon footprint, all while creating a high-quality, safe living environment for students,” said Matt Bogatay, Bogatay Construction President.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition