Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing. Construction has an estimated completion date of December 2025.

The facility was designed to showcase its mass timber construction, a deliberate move toward reducing the building’s carbon footprint. The goal is to create a warm, high-quality, long-lasting space for students to relax and collaborate. Students participated in the steering committee that guided the new space’s aesthetic.

“This new residence hall demonstrates how Oregon Tech continues to lead in sustainability and innovation while addressing the needs of our growing student community,” said Dr. Nagi Naganathan, Oregon Tech President. “With support from the Oregon Legislature and the Office of the Governor, Oregon Tech is constructing one of the first residence halls in Oregon to utilize mass timber floors and roofs with panelized wood frame walls, and it will serve as a landmark example of carbon-efficient construction in higher education.”

The college is partnering with Bogatay Construction, Inc., also based in Klamath Falls, for the project’s construction. The news release reports that 89% of the project’s work is coming from firms within a 100-mile radius of campus.

“Using prefabricated CLT panels reduces labor, material waste, and the building’s carbon footprint, all while creating a high-quality, safe living environment for students,” said Matt Bogatay, Bogatay Construction President.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.