Tennessee District Opens New Central Office

The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness. The two-story building will unite most district personnel beneath one roof.

The space will include amenities like a 2,800-square-foot assembly space with AV technology, a wellness area, an open-air courtyard, and loading and storage spaces. The project also included renovating an existing building into the 12,400-square-foot FSD Facilities and Transportation Center. The space features administrative offices, a meeting area, drivers’ lounge, maintenance space and equipment, and storage space.

“At Wold, our ultimate mission is to support the communities in which we live, work and play, and we could not be more grateful for our ongoing partnership with Franklin Special District that allows us to design spaces that bring this vision to life,” said Wold Architects & Engineers Principal Steve Griffin. “This new office blends modern functionality with timeless design, creating a space that not only enhances efficiency and collaboration but also reflects Franklin’s rich architectural heritage. Seeing this project complete is incredibly rewarding, and we’re proud to support a district that values innovation, community and staff well-being.”

FSD also partnered with Nabholz for construction management services, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition