University of Kentucky Integrates New Cleaning Technology

The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant. The technology deploys small rubber balls into the condenser’s water flow every 20 minutes, the news release reports, reducing the manual labor required to keep them functioning.

“As part of our ongoing commitment to sustainability and energy efficiency, the installation of this technology represents the latest step toward optimizing energy use on campus,” said Mary Vosevich, the university’s vice president for facilities and chief facilities officer. “By streamlining maintenance processes with this technology, we’re not only saving valuable resources but also reinforcing UK’s role as a innovate leader in facilities management.”

According to the news release, the university uses district cooling, which produces chilled water at a network of central plants and sends it miles away through underground pipes to university buildings. Scale and dirt can accumulate on the inner walls of the tubes, decreasing energy efficiency over the course of a season. The current cleaning process requires shutting the system down and sending a brush through about a thousand tubes.

The new system automatically injects small rubber balls into the water flow to scrub away the scale or dirt without manual labor or deactivating the system.

“Having a system that can keep the tubes clean year-round helps us fix the long-standing challenge of losing efficiency through the year as contaminants build up in the tubes,” said Carter Whitton, the Facilities Management team’s utilities systems manager. “Achieving those improvements will be a tremendous energy saver and have a substantial sustainability impact.”

According to the news release, the Helios Tube Cleaning System is expected to save the university tens of thousands of dollars per year.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.