Minnesota District Partners with Kraus-Anderson on Four Construction Projects

Stillwater Area Schools in Lake Elmo, Minn., recently announced a partnership with Kraus-Anderson for construction projects at four schools in the district, according to a news release. The projects’ funding comes from a $175-million referendum passed in November 2023. The projects include replacement facilities for Lake Elmo and Andersen Elementary Schools, an expansion at Oak-Land Middle School, and renovations to Stillwater Area High School.

The new, 150,000-square-foot Lake Elmo facility will include amenities like 53 flexible classrooms; breakout areas and collaboration space; and specialized areas for music, art, media, and special education. Outdoor amenities will include two kickball fields, playground spaces, and parking lots with dedicated traffic-flow direction, the news release reports.

Lake Elmo Elementary School Rendering
Image courtesy of Kraus-Anderson

Bayport Elementary, which will replace the existing Andersen Elementary, will measure in at 98,000 square feet and feature classroom pods, a learning commons, cafeteria, gym, and storm shelter.

Meanwhile, Oak-Land Middle School will see 64,699 square feet of additions, including a new gym and classroom spaces. The existing gym will be converted into a media center, and the existing media center into administration offices, according to the news release.

Lastly, Stillwater Area High School’s 10,910-square-foot project includes an office addition and renovations gym equipment, patient lift, interior partitions, floors, ceilings, roofing, and various maintenance improvements, the news release reports.

The district also partnered with Wold Architects and Engineers for the projects’ designs. Construction has an estimated completion date of August 2025.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition