Texas K–12 District to Build New Elementary, High Schools

The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

The project consists of building separate elementary and high-school buildings that will share a new gym and library facility. Construction has an estimated completion date of August 2027, local news reports. Once the new facility opens, the existing high school and elementary buildings will be demolished and replaced with school parking.

According to local news from April 2025, the existing facilities are 76 years old and are aging out of use. Three buildings—extracurricular facilities used for cheerleading, weight training, and athletics—have been condemned. Further review indicated that renovation and repair would cost almost as much as building new facilities.

“This will meet our needs,” said High Island ISD Superintendent David Walker. “This school is a part of the community in a lot of ways. If we didn’t have the school, we wouldn’t have our community.”

12NewsNow reports that design and construction plans will be finalized by September and that groundbreaking is scheduled for January 2026. The project should involve “very minimal traffic issues in moving students and everything,” said Walker.

The bond had originally promised no tax rate increase for local taxpayers. Instead, the district will implement a tax rate decrease of 8 cents, even with the bond’s passage.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.