Texas K–12 District to Build New Elementary, High Schools

The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

The project consists of building separate elementary and high-school buildings that will share a new gym and library facility. Construction has an estimated completion date of August 2027, local news reports. Once the new facility opens, the existing high school and elementary buildings will be demolished and replaced with school parking.

According to local news from April 2025, the existing facilities are 76 years old and are aging out of use. Three buildings—extracurricular facilities used for cheerleading, weight training, and athletics—have been condemned. Further review indicated that renovation and repair would cost almost as much as building new facilities.

“This will meet our needs,” said High Island ISD Superintendent David Walker. “This school is a part of the community in a lot of ways. If we didn’t have the school, we wouldn’t have our community.”

12NewsNow reports that design and construction plans will be finalized by September and that groundbreaking is scheduled for January 2026. The project should involve “very minimal traffic issues in moving students and everything,” said Walker.

The bond had originally promised no tax rate increase for local taxpayers. Instead, the district will implement a tax rate decrease of 8 cents, even with the bond’s passage.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.