Texas District Finishes Construction on New Middle School, Admin Building

The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

The July 31 ceremony included an open house and guided tours before the start of school on Aug. 13. Funding for the middle school came from Bond 2021, a $38-million bond referendum that went toward new facilities, renovations, and repairs and upgrades around the district. Funding for the administration building came through local resources and wasn’t included in the bond package, according to the news release.

“These new facilities are a testament to the vision of our community and the commitment to creating learning environments where our students can thrive,” said WISD Superintendent Wade Stanford. “We’re already seeing a positive impact on student engagement and staff collaboration.”

The district partnered with Fitzpatrick Architects and Pfluger Architects for the project’s design, as well as Jackson Construction for construction services. The project consisted of renovating four existing buildings into a single facility. The campus consists of new and refurbished buildings that took advantage of existing structures, foundations, and loadbearing walls.

“The design intent is to support the learning space profile defined by input from the community, parents, staff, and students,” said Pfluger CEO Terry Hoyle. “The learning spaces include flexible and comfortable instructional spaces; collaborative spaces for engagement, creativity, and student choice; and non-academic spaces for community engagement and outdoor learning.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.

  • UCF Modernizes College of Hospitality Management

    The University of Central Florida in Orlando, Fla., recently completed a major renovation effort for the Rosen College of Hospitality Management, according to a news release. The project modernized 77,600 square feet worth of academic classrooms, teaching labs, and collaborative spaces to support both students and faculty.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.