Tennessee State University Gains Approval for New Engineering Facility

Tennessee State University in Nashville, Tenn., recently announced that it has received approval from the Tennessee State Building Commission to build a new engineering building on campus, according to a university news release. The 70,000-square-foot, $50-million facility will play home to the university’s engineering programs and the Applied & Industrial Technology program, providing a consolidated complex for innovation, research, and collaboration. Construction will begin later this year and has an estimated completion date of summer 2027.

“Over the years, our college has experienced significant growth in students, faculty, research, and academic programs,” said Dr. Lin Li, Dean of the College of Engineering. “This facility will provide a world-class space that enhances interdisciplinary collaboration across six undergraduate programs, three master’s programs, and one Ph.D. program. It will also host innovative engineering activities that directly benefit the metro Nashville area and Middle Tennessee.”

The facility features classrooms; computer labs; and a combined total of 30 teaching and research labs, including a Future Energy Lab, Drone Flight and Air Traffic Lab, and an Additive Manufacturing Lab, the news release reports. The university partnered with Melvin Gill & Associates and Bauer Askew Architecture for the project’s design.

“The new engineering building is the first step in elevating Tennessee State University’s engineering program to meet the demands of industry and the state of Tennessee,” said Will Radford, the university’s assistant vice president of Planning, Design, and Construction. “By establishing new partnerships and providing modern facilities, we are positioning TSU engineering students to not only keep pace but to set standards in the industry.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.