California High School Starts Construction on STEAM, Music Buildings

Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

The new STEAM Building will stand four stories and measure 24,000 square feet, according to the news release. It will feature general classrooms, two science classrooms with lab preparation space, and a photography classroom with a separate support space, storage rooms, and staff collaboration and conference areas.

Amenities of the 9,000-square-foot Music Building are set to include ensemble rooms for choir and band students, a recording studio, practice rooms, music library, storage space, and lobby areas, the news release reports.

“This is an incredibly exciting time as we welcome students and staff back to school for a new year, and simultaneously get started on these Measure B projects,” said TUHSD Superintendent Dr. Courtney Goode. “This investment in our community will allow us to support the highest quality education for our students, with facilities and technology that will help them gain the skills to lead in a competitive world.”

Sustainability features of the two projects include a solar photovoltaic system on the STEAM Building, drought-resistant and native landscape features, smart plumbing fixtures, and LED fixtures and occupancy sensors in both buildings.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Minnesota District Starts Construction on Early Childhood Learning Center

    Sauk Rapids-Rice Public Schools in Sauk Rapids, Minn., recently announced that construction has begun on a new early childhood learning center and a new outdoor activities complex, according to a news release.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.