Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026. Other partners were TurnerBaston Architects as project architect and M.J. Harris Construction Services, LLC, as the general contractor.

The Smith Family Center for Performing Arts will measure in at 130,088 square feet and bring all of the Department of Theatre and Dance’s academic and performance needs within a single area on campus, the news release reports. Amenities will include a 450-seat dance theater, a 350-seat drama theater, a 250-seat studio theater, a scenery shop, rehearsal space, and control rooms.

“We are proud to celebrate this important milestone alongside UA and our project partners,” said HPM Senior Project Manager Austin Fisher. “The Smith Family Center for Performing Arts will be a centerpiece for creativity and learning on campus, and reaching the topping out is a testament to our teams’ expertise and dedication to getting the job done on time. We look forward to bringing the vision for this facility to life and delivering a space that will inspire generations of students, faculty members and audiences.”

The facility will connect via a new lobby to the Peter Bryce Main building, which—following construction—will house the department’s faculty offices and academic spaces.

The university and HPM have previously partnered on campus venues like Julia Tutwiler Hall, Bryant Denny Stadium, Rhoades Softball Stadium, Coleman Coliseum, and the Mal M. Moore Athletic Facility, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • nursing students talk while studying in a hallway

    Elsevier Launches VR Simulation Solution for Nursing Students

    Elsevier has introduced Shadow Health Lab with Virtual Reality, a simulation platform that allows nursing students to interact with virtual patients and build clinical judgment skills in a safe, realistic environment.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.