North Carolina District Completes New Elementary School

The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district. The new school has the capacity for 800 students in grades K–5.

“We know the pressure our school systems are under as communities grow,” said Jeff Sandeen, president of Balfour Beatty, Carolinas. “At Balfour Beatty, our role is to be our client’s steady partner by showing up, listening and building the planned facilities that students and teachers need to succeed. Rex Road Elementary is one of those projects where we all worked together to achieve the same goal and the results speak for itself.”

Rex Road Elementary will feature amenities like classrooms, a learning commons area, gymnasium, cafeteria, and media center, the news release reports. The new school was built to address district needs regarding overcrowding and a growing population.

Balfour Beatty has been working with WCPSS since 2007 to deliver projects like Southeast Raleigh Elementary, Green Level High School, Lynn Road Elementary School, and Pine Hollow Middle School, among many others. Ongoing projects with the district include additions and renovations at Athens Drive Magnet High School; additions and renovations at Ligon Road Middle School; and the construction and relocation of Wake Early College of Information & Biotechnologies and Parkside Middle School into a single, 230,000-square-foot facility, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Rochester to Break Ground on New Student Life Center

    The University of Rochester in Rochester, N.Y., recently began construction on a new Student Life building, according to a news release. The first floor will contain campus-wide gathering, program, and rehearsal space; the second floor will play home to the Greenbaum Center for Jewish Life.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Amazon Expands Lockers to More Than 500 College, University Campuses

    Amazon recently announced that its Locker Network now totals more than 750 locations at more than 500 college and university campuses around the United States, according to a company news release.