California K–12 District Completes Elementary School Campus Replacement

The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade. The district partnered with Quattrocchi Kwok Architects and Alten Construction for the build, which was funded by Bond Measure R.

“This campus marks a new era for our students and the entire community,” said Cheryl Cotton, district superintendent. “These facilities are a source of immense pride, replacing buildings that were no longer up to code or capable of supporting our educational programs. The campus now provides students and staff with the essential resources they need to thrive. Thank you to the project team and the community for your support in bringing our new school to life.”

Lake Elementary School exterior
Image courtesy of Quattrocchi Kwok Architects

The 56,700-square-foot campus uses a “Learning Suite” concept, grouping individual classrooms around open, flexible spaces, according to the news release. Amenities include a library, administrative space, and a multi-purpose building with a kitchen and cafeteria. Improvements to the outdated and undersized campus involved high-elevation, synthetic turf fields and paved play areas.

“We are proud to partner with the district and Alten to make the new Lake Elementary School a reality,” said John Dzbczak, QKA Principal. “Our priority was ensuring a safe learning environment both during the complex phases of construction and for generations of students to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.