California K–12 District Completes Elementary School Campus Replacement

The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade. The district partnered with Quattrocchi Kwok Architects and Alten Construction for the build, which was funded by Bond Measure R.

“This campus marks a new era for our students and the entire community,” said Cheryl Cotton, district superintendent. “These facilities are a source of immense pride, replacing buildings that were no longer up to code or capable of supporting our educational programs. The campus now provides students and staff with the essential resources they need to thrive. Thank you to the project team and the community for your support in bringing our new school to life.”

Lake Elementary School exterior
Image courtesy of Quattrocchi Kwok Architects

The 56,700-square-foot campus uses a “Learning Suite” concept, grouping individual classrooms around open, flexible spaces, according to the news release. Amenities include a library, administrative space, and a multi-purpose building with a kitchen and cafeteria. Improvements to the outdated and undersized campus involved high-elevation, synthetic turf fields and paved play areas.

“We are proud to partner with the district and Alten to make the new Lake Elementary School a reality,” said John Dzbczak, QKA Principal. “Our priority was ensuring a safe learning environment both during the complex phases of construction and for generations of students to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.