Harvard Announces Replacement Facility for Native American Program

Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP)—both its academic and social components. The building will open in time for the 2027–28 school year.

Amenities will include offices, reception and recreation lounges, kitchens, a conference room, and a covered front porch and rear deck. The basement will play home to storage and mechanical space, and outdoor areas will provide space for cultural programming and ceremonies, the news story reports.

HUNAP’s current facility was built in 1873 and acquired by the university in 2023. A feasibility review found that the building’s structure was deteriorated beyond hope of renovation and that renovating the existing structure would “essentially require the construction of a new building within the shell of the existing building,” according to the Harvard Crimson.

HUNAP is a multi-school initiative within the university whose work encompasses “Native American studies, history, and cultural engagement, including academic programming, community events, research and travel grants, and tribal diplomacy efforts.” The facility’s design will invoke Native materials and symbolism; the exterior façade draws inspiration from tree bark and wampum.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.