Moline-Coal Valley School District to Consolidate Two Schools into New Facility

The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School, and it will have the capacity for 600 students in grades K–5.

Construction will consist of a 61,000-square-foot addition and 32,000 square feet of renovations to the existing Lincoln-Irving facility, local news reports. The project has an estimated completion date of fall 2027 and will cost $33.8 million.

“This is an incredible honor and moment of great pride and lasting significance that we all gather here today to officially dedicate this school and honor an extraordinary man,” said Chris Ontiveros, son of the building’s namesake, during the groundbreaking ceremony. “To name a school after an individual places their values permanently into the foundation and education itself and ensures that every student walks through these doors is reminded every single day of the power of character, work ethic, integrity and service. These are the very same qualities that my father portrayed and acted every single day of his life.”

The district partnered with Legat Architects for the project’s design and Estes Construction for its construction. During renovations, the students and staff of Lincoln-Irving will move to Western Illinois University through the end of the 2026–27 academic year.

“This project is more than a building,” said Jeff Sandberg, Legat Architects CEO. “It represents opportunity, growth and a commitment to the next generation of the community. By bringing Lincoln-Irving and Willard together into one unified environment, we're creating a space designed to support collaboration, innovation and student success.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Universities Continue to Launch Multimillion-Dollar Campus Transformations

    What makes the current wave of campus development especially noteworthy is its emphasis on multi-use functionality and community integration. Institutions are no longer investing solely in academic or athletic facilities in isolation. Instead, they are creating destinations that blend recreation, health, housing, and event-driven economic activity.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.