Moline-Coal Valley School District to Consolidate Two Schools into New Facility

The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School, and it will have the capacity for 600 students in grades K–5.

Construction will consist of a 61,000-square-foot addition and 32,000 square feet of renovations to the existing Lincoln-Irving facility, local news reports. The project has an estimated completion date of fall 2027 and will cost $33.8 million.

“This is an incredible honor and moment of great pride and lasting significance that we all gather here today to officially dedicate this school and honor an extraordinary man,” said Chris Ontiveros, son of the building’s namesake, during the groundbreaking ceremony. “To name a school after an individual places their values permanently into the foundation and education itself and ensures that every student walks through these doors is reminded every single day of the power of character, work ethic, integrity and service. These are the very same qualities that my father portrayed and acted every single day of his life.”

The district partnered with Legat Architects for the project’s design and Estes Construction for its construction. During renovations, the students and staff of Lincoln-Irving will move to Western Illinois University through the end of the 2026–27 academic year.

“This project is more than a building,” said Jeff Sandberg, Legat Architects CEO. “It represents opportunity, growth and a commitment to the next generation of the community. By bringing Lincoln-Irving and Willard together into one unified environment, we're creating a space designed to support collaboration, innovation and student success.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.