Embry-Riddle Completes Construction on Research, Lab Facility

Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer. The university partnered with ikon.5 architects as the project’s lead designer and with Hoar Construction for construction services.

The 35,000-square-foot facility contains specialized laboratory space that can simulate space and atmospheric conditions, the news release reports; it also features a clean room to sterilize equipment for space operations.

“CAT II is a great example of how thoughtful planning and collaboration can bring highly technical spaces to life,” said Erika Charlassier, Hoar Construction project manager. “From advanced laboratories to the sterilization room, every element of this facility was built to support innovation. Our team worked closely with Embry-Riddle to safely navigate complex conditions while maintaining schedule and budget, delivering a space that will help shape the future of aerospace research and education.”

The construction process took into consideration student planes frequently taking off and landing from the nearby Daytona Beach International Airport. Hoar Construction worked with the university to ensure the placement of equipment like cranes, boom pumps, and forklifts never exceeded the height of the building itself to keep airspace clear.

Hoar previously partnered with Embry-Riddle on the construction of a 239,172-square-foot, four-story parking garage including office space on the ground floor.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.